News

Actions

James River Bridge closures this weekend

Posted at 11:23 AM, May 17, 2013
and last updated 2013-05-17 11:23:34-04

Isle of Wight – VDOT bridge maintenance crews will close the left lane in each direction of the Route 17 James River Bridge beginning Friday, May 17, at 9 p.m. through Monday, May 20, at 5 a.m.

Crews will be performing partial median barrier construction work.

VDOT attempts to schedule maintenance during travel periods when traffic volumes are lower, to reduce impact to motorists.

Motorists are encouraged to visit http://www.511virginia.org , call 511 or listen to Highway Advisory Radio (HAR) 1680 AM or call the Traffic Information Line at 757-361-3016 for current traffic and travel information.