News

Actions

Next week: Lane closures on Butts Station Road and extra Centerville Turnpike bridge lifts

Posted

LANE CLOSURE ON BUTTS STATION ROAD

AFFECTED AREA: Eastbound Butts Station Road between Elbow Road and Centerville Turnpike

DATES: Monday, January 26 through Thursday, February 26

INFORMATION: The installation of a sewer main and water line will close the eastbound lane on Butts Station Road between Elbow Road and Centerville Turnpike from Monday, January 26 through Thursday, February 26.  Eastbound traffic will be detoured via Elbow Road to Centerville Turnpike.  Motorists should be alert to work crews, equipment in the area and possible delays.

LIFTS AT CENTERVILLE TURNPIKE BRIDGE

AFFECTED AREA:  Centerville Turnpike Bridge

DATES:

Monday, January 26 from 1:30-5 p.m.

Tuesday, January 27 from 9 a.m. – 5 p.m.

Wednesday, January 28 from 9 a.m. – 5 p.m.

Thursday, January 29 from 9 a.m. – 5 p.m.

Friday, January 30 from 9 a.m. – 1 p.m.

INFORMATION: An inspection of the Centerville Turnpike Bridge may require lifts next week between the times shown above even when vessels are not passing through.  The lifts, when needed, will remain on schedule (on the hour or half hour).  Lifts will be around 10 minutes long.