News

Actions

First Warning Traffic – Thursday Traffic Alerts

Posted at 6:35 AM, Jul 14, 2016
and last updated 2016-07-14 11:42:17-04

BRIDGE OPENINGS:

*NEW SET SCHEDULE* Gilmerton Bridge 9:00 AM, Noon, 3:00 PM and 7:00 PM – M-F Daily – 9:00 AM & 3:00 PM Saturday and Sunday

James River Bridge 2:00 PM

 *

ERT WEEKLY CONSTRUCTION SCHEDULE: Downtown and Midtown Tunnel Closures Friday, July 8 to Friday, July 15

U.S. 58 East: Full weekend tunnel closure from Friday, July 15 at 8 p.m. through Monday, July 18 at 5 a.m.

 I-264 East/West: Lane closures in each direction between Effingham Street and Frederick Boulevard Friday through Friday, July 8-15 from 8 p.m. each night until 5 a.m. the following morning.

 *

HAMPTON ROADS WEEKLY LANE CLOSURES REPORT: July 8, 2016 through July 15, 2016

 I-64 Widening Project, Newport News/York County: Single-lane closures eastbound and westbound July 10-14 as early as 9 p.m. until 5 a.m. the following morning. All work will take place between Jefferson Avenue and Lee Hall, and one lane will remain open to traffic at all times. Please check http://www.i64widening.org/news_information/traffic_alert.asp for the latest closure/detour information.

 Elizabeth River Tunnels/Martin Luther King, Jr. Freeway:  Please check Elizabeth River Tunnels website for the latest closure and detour information regarding the Downtown Tunnel, Midtown Tunnel and the MLK Freeway.

 I-564 Intermodal Connector, Norfolk: Please check http://www.i564intermodal.com/ for the latest closure/detour information.

 Terminal Boulevard Resurfacing, Norfolk: Nightly weeknight closures eastbound as follows:

  • July 8-11 from 8 p.m. until 5 a.m. the following morning.
  • Weeknights July 11-14 from 8 p.m. until 5 a.m. the following morning.

 I-64 Hampton Roads Bridge-Tunnel: Alternating lane closures eastbound and westbound. One lane will remain open at all times:

  • Westbound July 11-14 from 9 p.m. until as late as 5 a.m. the following morning.
  • Eastbound July 12-14 from 9 p.m. until 4:30 a.m. the following morning.

 I-664 Monitor-Merrimac Memorial Bridge-Tunnel: Alternating lane closures northbound and single-lane closures southbound as follows. One lane will remain open at all times:

  • Northbound July 11-14 from 9 p.m. until 5 a.m. the following morning.

I-64 High Rise Bridge: Single-lane closures as follows. One lane will remain open at all times:

  • Westbound July 11-14 from 9 p.m. until 5 a.m. the following morning.

Military Highway Continuous Flow Intersection, Norfolk: Single-lane closures northbound and southbound July 10-15 from 7 p.m. until 5 a.m. the following morning on Military Highway between the I-64 overpass to Elizabeth Avenue.

VA-31 Northbound/Southbound, Surry County: Alternating lane closures July 10-14 from 8 p.m. to 6 a.m. from Jamestown-Scotland Ferry (Rolfe Highway) to Surry County line. One lane will remain open at all times.

VA-31 Northbound/Southbound Jamestown Road, James City County: Alternating lane closures July 11-15 from 9 a.m. to 3 p.m. from VA-199 to Jamestown Road. One lane will remain open at all times.

 Route 301 Sussex Drive, Greensville County: Consecutive left northbound lane closure for bridge replacement June 23 through late summer on Route 301.Route 680 over Stallings Creek, Isle of Wight County: Full consecutive closure on Route 680 over Stallings Creek for bridge replacement May 16 through June 2017.

Route 621 over Passenger Swamp, Isle of Wight County: Full consecutive closure on Route 621 over Passenger Swamp for bridge replacement June 28 through June 2017.

George Washington Memorial Highway (Route 17), York County: Crews are widening the road between Route 630 (Wolf Trap Road) and Route 706 (Hampton Highway). Daytime single-lane closures, from 9 a.m.to 3 p.m. and weeknight single-lane closures, from 7 p.m. to 5 a.m. Expect traffic shifts and delays. For more about this project, please visit the Route 17 Widening website.

*

CHESAPEAKE ROAD WORK:  Battlefield Blvd/Medical Pkwy intersection closures Monday, July 11 through September

Public Utilities will close various lanes at the Battlefield Blvd and Medical Pkwy intersection over the next 10 weeks for the replacement of water and sewer lines in the area.  Next week the right-turn lane on Medical Pkwy will be closed.