News

Actions

First Warning Traffic – Bridge openings and road work

Posted at 5:51 AM, Mar 16, 2017
and last updated 2017-03-16 10:48:24-04

VIRGINIA BEACH: Road Improvements to Ferrell Parkway

The project will include milling, paving and pavement marking work on both eastbound and westbound Ferrell Parkway from Indian River Road to Indian Lakes Boulevard at Parkway Place Market Shopping Center; and from southbound Princess Anne Road from the Salem Road overpass to Lynnhaven Parkway.  Work will be from 7 p.m. to 5 a.m. each evening.

All night time milling will be from 7 p.m. to 5 a.m.  Any paving and marking work that needs to be done during the weekday hours will be from 9 a.m. until 3 p.m.  Any weekend work – if needed – will be scheduled between the hours of 7 a.m. and 5 p.m.

The work is expected to be completed by March 25, 2017.    

ERT WEEKLY CONSTRUCTION SCHEDULE MIDTOWN AND DOWNTOWN TUNNEL

I-264 West: Downtown Tunnel open with a single lane closure Thursday, Mar. 16 from 8 p.m. until 5 a.m. the following morning.

U.S. 58 East: Midtown Tunnel full weekend closure from Friday, Mar. 17 at 8 p.m. until Monday, Mar. 20 at 5 a.m.

HAMPTON ROADS WEEKLY LANE CLOSURES REPORT March 12, 2017 through March 19, 2017

  • I-64 Widening Project, Newport News/York County:
    • Segment I: Single-lane closures east and west from Lee Hall (exit 247) to Jefferson Ave. (exit 255) March 13-16 from 8 p.m. to 5 a.m.
      • The westbound right lane of Fort Eustis Boulevard will close under I-64 on March 13-16 from 9:30 a.m. until 3:30 p.m.
    • Segment II: There will be single-lane closures on I-64 east and west between Camp Peary (exit 238) to Fort Eustis (exit 250) March 12-17, starting as early as 7 p.m. until 5 a.m. the following morning for installation of barrier walls, pavement marking and sign installation.
      • Yorktown Road and Jefferson Avenue will have a right-lane closure in both directions under I-64 for sign installation March 16-17 from 9 a.m. to 3 p.m.
    • The speed limit is reduced to 55mph in the I-64 work zone in both directions.
    • Please check http://www.i64widening.org/news_information/traffic_alert.asp for the latest closure/detour information.
  • I-64 Hampton Roads Bridge-Tunnel: Single-lane closures as follows. One lane will remain open at all times:
    • Westbound March 15-16 from 9 p.m. to 5 a.m.
  • I-64 Reversible Roadway: All lanes will be closed as follows:
    • March 16 from 9 a.m. to 1:30 p.m.
  • I-264 Ramp closures, Norfolk: Overnight ramp closures as follows. Only one ramp will be closed at any time, and no ramp will remain closed the entire night.
    • Westbound off-ramp 13B (Military Highway) March 16 between 9 p.m. and 5 a.m. the following morning.
    • Military Highway Southbound on-ramp to I-264 Westbound March 16 between 8 p.m. and 5 a.m. the following morning.
    • Military Highway Northbound on-ramp to I-264 Eastbound March 16 between 8 p.m. and 5 a.m. the following morning.
  • I-664 Monitor-Merrimac Memorial Bridge-Tunnel: Single-lane closures overnight on I-664 southbound from 26th Street to Terminal Avenue as follows. One lane will remain open at all times.
    • March 15-16 from 7 p.m. to 5 a.m.
    • March 17 from 9 p.m. to 8 a.m.
    • March 18 from 8 p.m. to 6 a.m.
    • March 19 from 7 p.m. to 5 a.m.
  • I-64 Westbound, Southside: Ramp closure and single-lane closure as follows:
    • Off-ramp to Indian River Road closed March 12-13 from 9 p.m. to 5 a.m.
    • Single-lane closure March 13-16 from 7 p.m. to 5 a.m. the following morning between Bay Avenue and 4th View Street.
    • Single-lane closure March 15-17 from 8 p.m. to 5 a.m. between George Washington Highway and the High Rise Bridge.
  • I-564 Westbound, Norfolk: Single-lane closures as follows:
    • March 16 from 9 a.m. to 10 a.m. at the Runway Tunnel.
  • I-564 Intermodal Connector Project: Single-lane closures as follows, extending approximately one-half mile between I-564 Chambers Airfield Tunnel at Naval Air Station Norfolk to the I-564/SR 406/Terminal Boulevard-Hampton Boulevard exit. One lane will remain open at all times:
    • Eastbound March 13-17 from 5 a.m. to 2:30 p.m.
    • Westbound March 13-17 from 9:30 a.m. to 5 p.m.
    • For more information on the I-564 Intermodal Connector, please visit I564intermodal.com.
  • US-17, James River Bridge: Single-lane closure southbound as follows. One lane will remain open at all times.
    • March 12-17 from 9 p.m. to 5 a.m.
  • Route 628 Northbound/Southbound, Wakefield: Consecutive-closure of all lanes as follows:
    • All lanes closed in both directions between West Church Street (Route 630) and Brittles Mill Road (Route 620) starting 8 a.m. March 15 and lasting until 6 p.m. March 16.
  • Route 641 Northbound/Southbound, Isle of Wight County: Consecutive closure of all lanes as follows:
    • All lanes closed in both directions until March 31. Detour along Collosse Road between Dardens Mill Road and Ballard Road.
  • I-95 Bridge Replacement over the Meherrin River Southbound, Emporia: Single-lane closures southbound as follows. One lane will remain open at all times:
    • Southbound March 13-16 from 9 a.m. until as late as 9 p.m. between Exit 13 and 11 at the Greensville County and Town of Emporia Line.
  • Military Highway Continuous Flow Intersection, Norfolk:
    • Alternating single-lane closures March 12-18 from 9 a.m. to 3 p.m. and from 7 p.m. until 5 a.m. the following morning. One lane will remain open at all times:
    • Military Highway between Valley Drive and Lynn Street.
    • Princess Anne Road between Sigmon Street and the intersection of Military Highway.
    • Northampton Boulevard between the intersection of Military Highway and past USAA Drive.
    • Robin Hood Road between Military Highway and Miller Store Road.
  • Courtland Interchange Project: U.S. 58, Southampton County: Consecutive alternating lane closures eastbound and westbound on U.S. 58 between Old Bridge Road (Route 742) and Shady Brook Trail (Route 650). One lane will remain open at all times:
    • March 13-17 from 6 a.m. to noon.